Extended risk assessment for Epsom Downs
FILM PRODUCTION RISK ASSESSMENT
|
Company Name: BF Productions
|
|
|
Production Title: Office Job
|
Production Date(s)
|
|
Producer Name: Billy Feery
|
Director Name: Billy Feery
|
|
Date of Risk Assessment: 07/06/18
|
Risk Assessment conducted by: Billy Feery
|
|
Hazard
|
Persons who may be harmed
|
Property which may be damaged
|
Risk controls already in place
|
Risk Assessment LOW, MODERATE,
HIGH, EXTREME
(see table)
|
Further action required to control
risk
|
|
Behaviour of dogs
|
Actors and crew
|
N/A
|
Assessed location and picked an area away from the
usual dog walker locations.
|
Moderate
|
Ask any dog-walkers around to keep their dogs on a
leash.
|
|
Horse riders
|
Actors and crew
|
Very unlikely however, if a horse became irritated
and uncontrollable they could wreck some of the equipment.
|
Horse riders are only aloud to ride in the area at
certain times of day (avoid that timeframe), avoid the horse tracks that are
usually in use.
|
Moderate
|
Contact the owners of the land so they can let the
riders know that there will be filming on site.
|
|
The public
|
Actors and crew
|
|
Area out of the way, less likely to encounter
members of the public.
|
Low
|
Have members of the crew who are currently free
prepared to direct members of the public away from the set.
|
|
Uneven ground with long grass
|
Actors and crew
|
If a member of the crew falls due to the uneven
ground, there is a chance they are holding equipment, which could be damaged
or broken due to the fall.
|
Address the situation with all actors and crew on
site, so they know. Park as close to location as possible so there is less
distance to travel by foot, which means less time for accidents to occur.
|
Low
|
Have someone without equipment in front guiding the
crew and actors to minimise the chance of falling.
|
Comments
Post a Comment